AN EMERGENCY REPAIR IS NEEDED IN THE 100 BLOCK OF SOUTH MARKET ST. LOW PRESSURE OR CLOUDY MAY RESULT UNTIL COMPLETED.
PHASE 2 CONSTRUCTION ON THE REPLACEMENT OF WATER MAINS
IS BEGINNING MONDAY, NOVEMBER 3, ON PORTIONS OF THE
FOLLOWING STREETS IN THE BOROUGH:
SHOULD YOUR PROPERTY OR RESIDENCE BE DIRECTLY IMPACTED,
YOU WILL RECEIVE SEPARATE CORRESPONDENCE FROM EAWA.
WE THANK YOU FOR YOUR UNDERSTANDING AND COOPERATION
AS WE CONTINUE WITH OUR ASSET REPLACEMENT PROGRAM.
Elizabethtown Area Water Authority
211 W. Hummelstown St. Elizabethtown, PA 17022
AN EMERGENCY REPAIR IS NEEDED IN THE 100 BLOCK OF SOUTH MARKET ST. LOW PRESSURE OR CLOUDY MAY RESULT UNTIL COMPLETED.